Phase 1 sets the price

The price is agreed after selection, on an open book, against the owner's independent estimate. If it is not agreed, the owner can take the design and procure the work another way.

Estimate Owner's concept Round 1 Round 2 30% design Round 3 60% design Price agreed Owner's budget gap off-ramp risk Conventional workflow With OpenBrIM option rounds With OpenBrIM option rounds Conventional workflow Estimate Concept 30% 60% Agreed Owner's budget gap
Each workshop chooses from code-checked options with quantities, so the estimate moves toward the owner's budget before the price is agreed.

Where we help

From the interview to the agreed price. The team picks the stages it needs.

  1. SelectionShow how you will run Phase 1

    Options on the owner's concept, code-checked and quantified, for the technical approach and the interview.

  2. Phase 1Check the owner's concept

    The conceptual design is rebuilt as a parametric model and checked. Where it fails, or carries more material than it needs, shows early.

  3. Phase 1Options at each workshop

    Alternatives ranked by the owner's goals: cost against its budget, schedule, risk and maintenance. The owner chooses from checked options.

  4. Phase 1Quantities for the open book

    Pay-item quantities traced to the model, for the contractor's estimate. Shared with the owner's independent estimator, the two estimates differ on prices, not on quantities.

  5. Agreed priceClose the gap to the budget

    Above the budget, the search looks for options that close the gap within the design criteria. Quantities for early work packages too.

How it works

The AI decides what to try next, within the engineer of record's design criteria and steered by the team's and the owner's feedback. Deterministic OpenBrIM software calculates the engineering, the quantities and the score.

Project team owner · designers · contractor · OpenBrIM feedback Search steered by the team Calculated deterministic: same inputs, same numbers AI agent chooses what to try next within the design criteria Generate parametric model billions of options Analyze 3D finite elements construction stages Check AASHTO LRFD project criteria Quantify pay items activities, durations Score owner's goals cost, schedule, risk parameters to try checked results, score Every check traces to its model, load case and AASHTO article Project team owner · designers · contractor · OpenBrIM feedback AI agent chooses what to try next within the design criteria Calculated: same inputs, same numbers Generate parametric model billions of options Analyze 3D finite elements construction stages Check AASHTO LRFD project criteria Quantify pay items activities, durations Score owner's goals cost, schedule, risk parameters checked results, score Every check traces to its model, load case and AASHTO article

What the score uses

The owner's goals, weighted

Cost against the owner's budget, schedule, risk and maintenance, each with the weight agreed at the workshops.

Public cost data, then the open book

Options are screened with public cost data. The ones the team takes forward are priced in the contractor's open-book estimate.

Team inputs, weighted

What the designers and the contractor add, such as production rates, crane sizes or fabrication limits, counts with the weight the team gives it.

Who does what

The OpenBrIM team joins yours for Phase 1, with the owner at the table. Each party keeps the decisions it is responsible for.

Owner

Sets the goals and the budget, joins each workshop and chooses between the options. Runs its own independent cost estimate.

Responsible for the choices and for agreeing the price
options at each workshop choices, goals
OpenBrIM team and AI agent

Joins Phase 1 and every workshop. Runs the search, analysis, checks and quantities in the design firm's workspace, and prepares the option comparisons.

Responsible for the software and for running the search
ranked options criteria, changes
Design firm, engineer of record

Owns the models and the design criteria. Reviews each round, presents the options with the team, adopts and seals.

Responsible for the engineering
Adopted and sealed
quantities open-book estimate
Contractor

Chooses methods, feeds back each round and prices on the open book.

Responsible for the price, means and methods
Open book with the owner

Steps

Confidentiality is part of the agreement. If you come to us during selection, we sign an NDA first.

Before we start

about a week · no charge until you accept the quote
  1. Contact and conflict check
  2. Quote, then licence if needed
  3. Agreement and project data

Selection

if the team wants it
  1. Interview optionsbefore the interview

Phase 1

Quoted per project
  1. Concept checkfirst weeks
  2. Optionseach workshop
  3. Estimate quantitieseach estimate
  4. Agreed priceend of Phase 1

Phase 2

OpenBrIM licence
  1. Final design

Each workshop, in the team's OpenBrIM workspace

  • Pay-item quantities, live from the model
  • Options ranked by the owner's goals
  • Check summary with AASHTO articles
  • Activities and durations
  • Quantities for early work packages

Terms

The same for every project.

No conflicts

During selection, we work with one proposing team. In Phase 1, never with the owner's independent estimator on the same project. The OpenBrIM licence stays open to every client.

The engineer of record decides

The design firm, as engineer of record, owns the models and the design criteria, and adopts and seals the design. Criteria change only with its approval.

Your data stays yours

Confidentiality is in the agreement, with an NDA first during selection. Data stays in the design firm's workspace, and the owner sees what the team chooses to share. Our access ends with Phase 1.

Priced per project

Suggested from the Phase 1 scope and the bridge construction budget. See Pricing below.

Pricing

Two parts. The licence applies only when the team's design firm is not yet an OpenBrIM client.

OpenBrIM licence
from$3,000per month

For a design firm that does not have OpenBrIM yet. Phase 1 runs in its workspace, and the models stay with it for final design.

Phase 1 AI
starting budget$50,000per project

We suggest the budget from the Phase 1 scope and the bridge construction budget you send us (see below). It varies per project.

Discuss a project

Email us the project, where it stands and its construction budget. We reply after a conflict check, with a suggested budget; it varies per project.

Email info@openbrim.org

No confidential material in the email. Project data goes into the design firm's OpenBrIM workspace once the agreement is signed.